Hey Sunshine, you're viewing an example ofPROreport.
Paris: Property Prices & Price per m² 2026
Secrets.RealEstate computes its Real Estate Score for any French address from official public data — the 36 insights in this report draw on 18.6 million notarial sale prices (DVF), state-mapped natural risks (Géorisques) and the national building database (BDNB).
Price trend for the surrounding area: median price per square metre (€/m²) by property type, with annual returns and volatility.
Your Investment Breakdown
Quick Calculator
Transfer Tax (5.8%)5,800
Notary (0.8%)800
Admin (~1.2%)1,200
Success Fee (6%)6,000
Finance (~1%)1,000
Total Investment€114,800
Financing Calculator
20%
€22,960
3.5%
1%8%
2.0%
1%5%
Loan Amount91,840
Monthly Payment€421
of which interest268
of which repayment153
Sold Properties Nearby
PROSELLER
Air Quality
B+
Air Rating
Fresh
Better than 80% of cities worldwide
Weather for Living
A
Climate Rating
171
Sunny Days
Year-Round Excellence
Winter
DEC - FEB
-4°20°
Mild & sunny
Spring
MAR - MAY
2°37°
Garden paradise
Summer
JUN - AUG
12°41°
Beach Season
Autumn
SEP - NOV
-2°22°
Perfect weather
Your Advantage Over Major Cities
VS LONDON
+6
More Sunny Days
VS PARIS
+12°C
Warmer Winters
VS MOSCOW
-60%
Less Heating Needed
VS DUBAI
-1°C
Cooler Summers
Sun Exposure
Summer solstice - longest day
Date: 21.06.2026(Summer Solstice)
Hours of Sunlight
0
1
2
3
4
5
6
7
8
9
10
11
12+
Shadow Calculator
Time10:00
Date: 21.06.2026 | Time: 10:00
Accessibility and Local Amenities
PROSELLER
Living Environment
PROSELLER
Noise
PROSELLER
51dB
Peaceful Environment
Your Peace of Mind Score: Good
This property provides good acoustic conditions suitable for most activities. Generally comfortable for daily living with occasional minor disturbances.
Sound Context Comparison
Sleep Quality
Good conditions
Family Living
Good conditions
Remote Work
Good conditions
Outdoor Spaces
Good conditions
Bathing Water Quality
PROSELLER
Understanding Your Risk
PROSELLER
Short-term rental (Airbnb)
PROSELLER
Can you rent this property out to tourists? Each commune sets its own rules. The map shows the communes around the property; the box shows what applies here.
Building Intelligence
PROSELLER
Category
Grade
What This Means For You
Energy Performance
BUILDING ENERGY CONTEXT
HIGH
100% of units rated E/F/G - energy-intensive co-ownership Out of 2 DPE ratings in the building: A=0, B=0, C=0, D=0, E=1, F=1, G=0. 100% of units are rated E, F, or G. Collective renovation likely - anticipate co-ownership capital calls. Multi-year renovation plan: varies by co-ownership Climate Law - Multi-Year Renovation Plan mandatory for co-ownerships > 15 years
100% of units rated E/F/G - energy-intensive co-ownership — Out of 2 DPE ratings in the building: A=0, B=0, C=0, D=0, E=1, F=1, G=0. 100% of units are...
Confidence: 90%
DPE REGULATION
MEDIUM
Poor energy performance - rental ban effective 2034 DPE class E: rental ban planned for 2034. Opportunity to renovate and increase property value before deadline. Climate & Resilience Law - class E rental ban from January 1, 2034
Poor energy performance - rental ban effective 2034 — DPE class E: rental ban planned for 2034. Opportunity to renovate and increase property value...
Confidence: 100%
ENVELOPE DEFICIENCY
MEDIUM
2 thermal envelope deficiency(ies) detected Weak points: uninsulated walls (U=2.5), uninsulated door (U=3.5). The thermal envelope determines 60-80% of the building's energy performance. Request insulation quotes from RGE-certified professionals for accurate pricing Insulation standards: RT2012 thresholds
2 thermal envelope deficiency(ies) detected — Weak points: uninsulated walls (U=2.5), uninsulated door (U=3.5). The thermal envelope determines 60-80%...
Confidence: 90%
THERMAL BRIDGE RISK
MEDIUM
Thermal bridges account for 16% of heat loss Thermal bridges represent 16% of total heat loss (18 W/K). Thermal bridges are the #1 cause of mold in older buildings and the hardest deficiency to fix — they occur at structural junctions (floors, balconies, window frames) where insulation is interrupted. Request thermal imaging survey to locate bridges — targeted treatment is possible but requires specialist assessment
Thermal bridges account for 16% of heat loss — Thermal bridges represent 16% of total heat loss (18 W/K). Thermal bridges are the #1 cause of mold in...
Confidence: 90%
ENERGY BILL ESTIMATE
MEDIUM
Estimated energy bill: 181 EUR/month (electricity) Based on DPE class E: 125 kWh/m2/year x 69 m2 = 8674 kWh/year. At 0.25 EUR/kWh (electricity), estimated annual cost: 2168 EUR (181 EUR/month). Improving to class D could reduce the bill to approximately 361 EUR/month (saving -181 EUR/month, -2168 EUR/year). Compare with actual utility bills from the seller. DPE estimates can differ from real consumption by 20-40% depending on occupant behavior and climate. DPE arrete du 31 mars 2021 — energy consumption expressed in final energy kWh/m2/year
Estimated energy bill: 181 EUR/month (electricity) — Based on DPE class E: 125 kWh/m2/year x 69 m2 = 8674 kWh/year. At 0.25 EUR/kWh (electricity),...
Confidence: 90%
GHG FOOTPRINT
INFO
Carbon footprint: GHG class B (9 kgCO2/m2/year) GHG class B emitting 9 kgCO2/m2/year. Energy class: E. Low carbon emissions — environmentally compliant. RE2020 — increasingly strict carbon limits for buildings
Carbon footprint: GHG class B (9 kgCO2/m2/year) — GHG class B emitting 9 kgCO2/m2/year. Energy class: E. Low carbon emissions — environmentally...
Confidence: 90%
GREEN ENERGY
INFO
No renewable energy installation No solar panels or renewable energy detected. Solar installation reduces energy bills and increases property value. Consult RGE-certified installer for solar assessment — eligible for MaPrimeRenov''
No renewable energy installation — No solar panels or renewable energy detected. Solar installation reduces energy bills and increases property value....
Confidence: 90%
Building Condition
INSULATION RENOVATION COST
HIGH
Wall insulation profile: murs en pierre de taille et moellons constitué d'un seul matériaux Stone walls without insulation — exterior insulation often impossible due to heritage constraints, interior insulation requires humidity management (200-350 EUR/m2). Stone buildings need specialized techniques. Standard insulation contractors may cause moisture damage. Request insulation assessment from RGE-certified professionals before budgeting renovation
Wall insulation profile: murs en pierre de taille et moellons constitué d'un seul matériaux — Stone walls without insulation — exterior insulation...
Confidence: 90%
RENOVATION PRIORITY
MEDIUM
Renovation priority: walls (60% of heat loss) Heat loss breakdown: walls 60%, windows 21%, doors 3%,. Priority: insulate walls first (60% of total losses).
Renovation priority: walls (60% of heat loss) — Heat loss breakdown: walls 60%, windows 21%, doors 3%,. Priority: insulate walls first (60% of total...
Confidence: 90%
RENOVATION SCOPE
MEDIUM
2 renovation area(s) identified Renovation scope: walls, doors. 2 area(s) require professional assessment. Request quotes from RGE-certified professionals before making an offer. Request detailed quotes from RGE-certified professionals and factor renovation scope into price negotiation
2 renovation area(s) identified — Renovation scope: walls, doors. 2 area(s) require professional assessment. Request quotes from RGE-certified...
Confidence: 60% — verify independently
BUILDING MATERIALS
INFO
Building materials: walls: PIERRE, roof: ZINC ALUMINIUM Construction materials: walls: PIERRE, roof: ZINC ALUMINIUM. Levels: 6, dwellings: 10. Material type affects insulation potential, maintenance costs, and renovation constraints.
Building materials: walls: PIERRE, roof: ZINC ALUMINIUM — Construction materials: walls: PIERRE, roof: ZINC ALUMINIUM. Levels: 6, dwellings: 10....
Confidence: 70%
WINDOW QUALITY
POSITIVE
Window quality: 0 weakness(es), 5 strength(s) Window assessment: Strengths: double glazing, bois frame (good thermal performance), low-emissivity coating (reduces heat radiation), insulating gas fill (argon ou krypton), shutters (Jalousie accordéon, fermeture à lames orientables y compris les vénitiens extérieurs tout métal, volets battants ou persiennes avec ajours fixes)
Last sale: 1,242,000 EUR on 2023-09-05 — 11,607 EUR/m2 Property last sold on 2023-09-05 for 1,242,000 EUR (11,607 EUR/m2). 2 apartment(s) of 107 m2 with ? room(s). Post-pandemic transaction — market may have shifted since.
Last sale: 1,242,000 EUR on 2023-09-05 — 11,607 EUR/m2 — Property last sold on 2023-09-05 for 1,242,000 EUR (11,607 EUR/m2). 2 apartment(s) of 107 m2...
Confidence: 80%
MARKET POSITION
INFO
Price 11,607 EUR/m2 vs local median 11,607 EUR/m2 (+0%) Individual price: 11,607 EUR/m2. Local median: 11,607 EUR/m2, mean: 11,066 EUR/m2 (6 transactions). Range: 7,258 to 13,634 EUR/m2. Compare with notarial data (DVF) for confirmation.
Price 11,607 EUR/m2 vs local median 11,607 EUR/m2 (+0%) — Individual price: 11,607 EUR/m2. Local median: 11,607 EUR/m2, mean: 11,066 EUR/m2 (6...
Confidence: 80%
Health & Environmental Risk
RISK SUMMARY
HIGH
Risk assessment: HIGH — 19 insights derived Critical: 0, High: 2, Medium: 7 out of 19 total insights. Top issues: 100% of units rated E/F/G - energy-intensive co-ownership; Wall insulation profile: murs en pierre de taille et moellons constitué d'un seul matériaux
Risk assessment: HIGH — 19 insights derived — Critical: 0, High: 2, Medium: 7 out of 19 total insights. Top issues: 100% of units rated E/F/G -...
Confidence: 60% — verify independently
Location & Infrastructure
COOWNERSHIP HEALTH
INFO
Registered co-ownership: 37 lots, 15 dwellings Co-ownership AC1945062: 37 total lots (15 dwellings, 0 parking, 13 commercial). Registered in national co-ownership register. Not flagged as in difficulty.
Fiber optic (FTTH) available — 1 connection point(s) Building has 1 internet connection point(s) with technologies: Fiber (FTTH). Fiber optic is available, ensuring high-speed connectivity. This is a positive factor for property value and remote work.
Fiber optic (FTTH) available — 1 connection point(s) — Building has 1 internet connection point(s) with technologies: Fiber (FTTH). Fiber optic is...
Confidence: 70%
DISTRICT HEATING
POSITIVE
District heating network: 50m away Building is 50m from district heating network. Connection possible as alternative to individual gas/oil boiler — typically lower cost and lower carbon emissions. Contact local district heating operator for connection feasibility and pricing Loi Energie-Climat — district heating networks prioritized in urban areas
District heating network: 50m away — Building is 50m from district heating network. Connection possible as alternative to individual gas/oil boiler —...
Confidence: 70%
Regulatory & Comfort
REGULATORY CONSTRAINT
MEDIUM
Urban planning constraints: urban planning constraint This building is subject to: urban planning constraint. Any modification to facade, roof, or structure requires approval from the Architect of French Buildings (ABF). Additional delays of 3-6 months for permits. Materials and renovation techniques are imposed. ABF approval required — expect significant surcharges on facade and roof work Heritage Code L621-1 (monuments), L631-1 (heritage sites)
Urban planning constraints: urban planning constraint — This building is subject to: urban planning constraint. Any modification to facade, roof, or...
Confidence: 100%
COMFORT QUALITY
LOW
Comfort: 2 strengths, 2 weaknesses Strengths: cross-ventilation (through apartment), multiple exposed facades (good natural light). Weaknesses: no air conditioning, natural ventilation only Consider improvements to comfort weaknesses — they affect resale value
Go through these 17 tips carefully and review each point with the utmost precision. Even a single overlooked aspect can cause financial damage amounting to tens or even hundreds of thousands of euros.
Tip
1
Have sales agreement reviewed
Have the preliminary sales agreement (compromis de vente) legally reviewed by a notary or lawyer to be on the safe side.
No suspensive conditions included – buyer loses deposit if unable to proceed.
After signing the compromis de vente, French law grants a 10-day cooling-off period (délai de rétractation) – you can withdraw with full deposit refund, no justification needed.
The 10 days start the day after you receive the signed compromis by registered letter (lettre recommandée avec accusé de réception).
Withdrawal must be sent by registered letter – email or verbal notification does not count.
If day 10 falls on a weekend or public holiday, the deadline extends to the next business day.
2
Check land registry and mortgages
Check entries such as easements (servitudes), rights of way (droits de passage), or mortgages (hypothèques) at the Land Registry Office (Service de Publicité Foncière).
Old easement discovered – neighbor has permanent right of way through garden.
3
Finalize financing
Ensure that your property loan (prêt immobilier) is approved before signing the final deed (acte authentique).
Loan refused after preliminary contract – 10% deposit forfeited.